Search Icon Grey
Banner Cornerimg

Sherrard High School Contracting Job

Crawford Division: Mechanical
Client: Sherrard High School, Sherrard, IL 
Challenge: Provide mechanical upgrade
Solution: Crawford installed two commercial boilers, one commercial water heater, and three pumps

Click for PDF

Project Summary:
Crawford Company's Mechanical Division performed work at Sherrard High School this summer. The high school was looking for a mechanical upgrade, which Crawford was able to provide. The upgrade included installation of (2) Bryan commercial electric boilers, (1) A.O. Smith 500 gallon commercial electric water heater, and (3) pumps. Crawford was also responsible for flushing the system and removing sediment that built up over time. 

WHAT ARE PEOPLE SAYING

Our new system that Crawford put in is significantly better than what we had in the past. We have a zone system in; it controls the entire house and the energy savings have been dramatic for us. We recommend a zone system to anyone.

Gregg M.