Search Icon Grey
Banner Cornerimg CONTACT

Sherrard High School Contracting Job

Crawford Division: Mechanical
Client: Sherrard High School, Sherrard, IL 
Challenge: Provide mechanical upgrade
Solution: Crawford installed two commercial boilers, one commercial water heater, and three pumps

Click for PDF

Project Summary:
Crawford Company's Mechanical Division performed work at Sherrard High School this summer. The high school was looking for a mechanical upgrade, which Crawford was able to provide. The upgrade included installation of (2) Bryan commercial electric boilers, (1) A.O. Smith 500 gallon commercial electric water heater, and (3) pumps. Crawford was also responsible for flushing the system and removing sediment that built up over time. 

WHAT ARE PEOPLE SAYING

Yesterday a young repairman named Spencer was here at my home. I had called your office for a repair as my air-conditioning was not working correctly. Spencer called but I was not available. When I returned Spencer's call he advised me as to what time he would arrive. He arrived at said time and was very courteous even though you had not put in my air-conditioning unit. It is very refreshing to find a company that not only hires personnel who attend to the problem at hand but are also courteous to your customers.

Connie Mohr-Wright