Sherrard High School Contracting Job
Crawford Division: Mechanical
Client: Sherrard High School, Sherrard, IL
Challenge: Provide mechanical upgrade
Solution: Crawford installed two commercial boilers, one commercial water heater, and three pumps
Click for PDF
Project Summary:
Crawford Company's Mechanical Division performed work at Sherrard High School this summer. The high school was looking for a mechanical upgrade, which Crawford was able to provide. The upgrade included installation of (2) Bryan commercial electric boilers, (1) A.O. Smith 500 gallon commercial electric water heater, and (3) pumps. Crawford was also responsible for flushing the system and removing sediment that built up over time.
WHAT ARE PEOPLE SAYING
I appreciate your expertise discussing my air conditioning project and our little doodles on paper for the finer points and needs. I enjoyed the personal attention to detail. I was impressed with the efficiency and professionalism of engineering, organizing, timing and installation. I'm so glad that we still have union contractors that know how to do things right. As you know I have worked 37 years thru the IBEW # 145. On larger projects we would be assigned a "tool buddy" to work in the same area and help each other when needed. The reason I mention this is because Jeff O'Leary is the kind of journeyman I would choose to work with. He is polite, calm, well-spoken and knowledgeable. Of course an HVAC system is not a kit. It is a custom installation. Jeff made it easy to discuss the finer points and the installation as needed. I enjoyed the experience and I am very pleased with the outcome. The air is fresh and clean and easy to breath.