Sherrard High School Contracting Job
Crawford Division: Mechanical
Client: Sherrard High School, Sherrard, IL
Challenge: Provide mechanical upgrade
Solution: Crawford installed two commercial boilers, one commercial water heater, and three pumps
Click for PDF
Project Summary:
Crawford Company's Mechanical Division performed work at Sherrard High School this summer. The high school was looking for a mechanical upgrade, which Crawford was able to provide. The upgrade included installation of (2) Bryan commercial electric boilers, (1) A.O. Smith 500 gallon commercial electric water heater, and (3) pumps. Crawford was also responsible for flushing the system and removing sediment that built up over time.