PCS Phosphate Fabrication Jobs

Crawford Division: Welded Fabrication
Client: PCS Phosphate
Challenge: Seamlessly remove existing cyclone and replace with new/improved system
Solution: Design, manufacture, and install corrosion and abrasion resistant cyclones

Click for PDF

Project Summary: 
Crawford Company recently completed the manufacture and installation of two stainless steel cyclones for PCS Phosphate, Marseilles, IL. The new units replaced the original carbon steel cyclones that were failing due to abrasion and corrosion. The cyclones collect the rock duct dust that contains weak phosphoric acid. The stainless steel cyclones will eliminate the corrosion aspect and also be more resistant to abrasion.

Crawford was responsible for field measurements, design and fabrication of the new vessels. Our experienced welders made the cyclones in our newly expanded metal fabrication facility.In addition, Crawford Company's field crew planned and executed the removal of the old cyclones and the installation of the new units during a plant shut down. This project is another example of Crawford's diverse group of employees working together with customers to complete a project on time and with in budget.

WHAT ARE PEOPLE SAYING

The day after the valve was replaced, we called again because we couldn't get the water in the shower hot enough. A tech came back out and made an adjustment. We are very happy with the service provided, and really appreciated the fact that someone could come out same day. I had made 5 calls to other outfits (going alphabetically in the phone book) before calling Crawford...you will be the first and only call I make for future issues.

Angie Foley