Challenge: Provide stainless steel materials, HVAC duct work, and dehumidification units based on plans and specifications
Solution: Crawford fabricated and installed stainless steel caps and column wraps, HVAC duct work, and installed two new dehumidification units

Click for PDF

Project Summary:
Crawford Company's Welded Fabrication and Commercial HVAC divisions were sub contracted through Conlon Construction Company to provide specific materials and labor for the remodel of Super Target. 

The Welded Fabrication Division fabricated 12" stainless steel column wraps. Column wraps are designed for column protection against shopping carts and abrasive wear from customers. Stainless steel wall caps were fabricated to accent the walls used to separate the Target Cafe. Crawford's Commercial HVAC Division installed the column wraps and wall caps. 

The Commercial HVAC Division was responsible for removing the existing dehumidification units and installing two new dehumidification units. Along with the duct work that runs to these units. New duct work was installed in the electronics department, and new spiral and square duct work was installed for the fitting rooms. 

Target's Mission:
Our mission is to make Target your preferred shopping destination in all channels by delivering outstanding value, continious innovation and exceptional guest experiences by consistently fulfilling our Expect More. Pay less. brand promise. 

WHAT ARE PEOPLE SAYING

Everything from the estimator to the installer went great. Tim installed new equipment like a true professional should. Being a service rep myself, I know how to please a customer. Crawford has employees that also go the extra mile to make sure everything is done right. Thanks!

Mike and Becki Webb